Data Center Migration in Vienna
Data center migration in Vienna means moving servers and network equipment between racks, rooms or facilities. Reboot Monkey engineers carry out the physical move inside the data centre, either as the whole project or alongside your own team, with who disconnects, reconnects and tests agreed per project.
In Data Center Migration
- Data Center Migration
- Colocation
- Data Center Decommissioning
- Rack and Stack
- Remote Hands
- Server Migration
- Smart Hands
- ITADon request
Data Center Migration
8
services detailed for Vienna
1
agreement for every city
Plan your Vienna migration
Send the equipment list, the source and destination and your timing constraints, and Reboot Monkey will respond with a quote.
In depth
Data Center Migration: 6 sections, open any to read more.
Data Center Migration in Vienna
Digital Realty VIE1/2 - Vienna stands on Louis-Haefliger-Gasse in Vienna. A migration here is a physical project inside a building that another company owns and runs. Reboot Monkey is a third-party datacenter services operator: it does not own the data centre and is not a hosting company. It sells rack space, IP transit, leased IP addresses, network and data-centre hardware, together with the services that deliver, install and support them. For a CTO, IT director or procurement manager, that means the migration is planned and carried out by one party that works inside the facility but is not the facility operator.
The operator keeps responsibility for the building, including its power, cooling and access policy. Reboot Monkey engineers work under the operator's site rules, so access arrangements and working conditions are settled with the facility before the move, not discovered on the day.
A migration usually starts with a list of what moves: servers, switches, storage and cabling, and where each item lands in the destination racks. Reboot Monkey works from that list so that every item has a defined source, a defined destination and a named person responsible for it at each step.
Datacenter Facilities in Vienna
Data centres in Vienna, ordered by the number of networks present:
- Digital Realty VIE1/2 - Vienna, Louis-Haefliger-Gasse 10, 1210 Vienna: 191 networks; carriers Arelion, Aristo Networks, Core-Backbone, EXA Infrastructure, Eranium Fabric and others
- NTT Vienna1 Data Center (VIE1) (NTT DATA's Global Data Centers division), Computerstraße 4, 1100 Vienna: 46 networks; carriers Core-Backbone, EXA Infrastructure, Inter.link, euNetworks and next layer
- Vienna University Computer Center (Wien) (University of Vienna), Universitaetsstrasse 7, 1010 Vienna: 27 networks; carriers Core-Backbone, euNetworks and next layer
- DATASIX Vienna (VIE1) (DATASIX Rechenzentrumsbetriebs GmbH), Hofmuehlgasse 3-5, 1060 Vienna: 20 networks; carriers Arelion and euNetworks
- Nessus NDC1, Fernkorngasse 10, 1100 Vienna: 13 networks; carriers euNetworks and next layer
- Nessus NDC2, Karmarschgasse 23-25, 1100 Vienna: 13 networks; carriers euNetworks and next layer
- VIVI Vienna (Wien) (KAPPER NETWORK-COMMUNICATIONS GmbH), Liebiggasse 9, 1010 Vienna: 8 networks
- ODC21 (IBM colocation site), Richard-Neutra-Gasse 10, 1210 Vienna: 7 networks; carriers next layer
- Raiffeisen Diana Haus (RDH) (Raiffeisen Informatik GmbH & Co KG), Lilienbrunngasse 7-9, 1020 Vienna: 6 networks; carriers euNetworks and next layer
- Raiffeisen Informatik Data Center (RDC) (Raiffeisen Informatik GmbH & Co KG), Stadlauer Straße 66, 1220 Vienna: 5 networks; carriers next layer
Our Data Center Migration Services
Server migration, in Reboot Monkey's terms, is moving equipment between racks, rooms or facilities. In Vienna that covers a move within one data centre, from one room to another, or between two facilities. The physical steps are the same in each case: equipment is powered down in an agreed order, disconnected and labelled, transported or moved within the building, then mounted, cabled and powered up again in its new position.
Reboot Monkey can run the whole physical move or work alongside your own team. Who disconnects, reconnects and tests the equipment is agreed per project, so your engineers can keep the steps that depend on your application knowledge while Reboot Monkey engineers handle the hands-on work in the racks.
A migration often needs more than the move itself, and the related services fit around it:
- Rack and stack: installing, mounting and cabling new hardware in the destination racks.
- Connectivity: Reboot Monkey orders the cross connects and carrier circuits from the facility operator and the carriers present in the facility, and its engineers install and patch the cabling in your rack.
- Smart hands: technical work that needs diagnostic judgement and configuration knowledge, for example when a device does not come up as expected after the move.
- Data center decommissioning: removing and disposing of retired hardware once the move is complete.
- Hardware monitoring: monitoring of your servers and network equipment by the Reboot Monkey NOC after the move.
Why Reboot Monkey
A migration puts production equipment in the hands of whoever does the physical work, so continuity of the people matters. A second, briefed Reboot Monkey engineer is named as backup for every customer site. If the lead engineer is unavailable, a colleague who already knows the site, the rack layout and the project plan takes over.
Reboot Monkey works the same way across locations. As of 2026, its field engineers work in 190 countries and more than 400 locations. For a company moving equipment between sites, that means source and destination can be handled by the same operator with the same working method.
The commercial side is kept plain. Prices are quoted on request and depend on the customer and the size of the job. To scope a move, send the equipment list, the source and destination locations and any timing constraints from your side, and Reboot Monkey will respond with a quote for the Vienna migration.
How Reboot Monkey Works
These terms apply in every facility in Vienna where Reboot Monkey engineers work.
- Response: 1-hour, around-the-clock incident response SLA, and a 15 minute premium response available where technicians are stationed on-site, as a paid add-on. The incident response SLA covers incidents and unplanned requests; on-site, dispatch and resolution times, priority tiers, and planned or scheduled work are agreed per site in the service agreement.
- Monitoring: 24/7 NOC monitoring across all facilities, covering IPMI, iDRAC, SNMP, temperature, power, network signals.
- Hardware: vendor-neutral technicians for Dell, HP, Cisco, Juniper and Arista equipment.
- Independence: independent from facility operators (not Equinix SmartHands, not NTT staff).
- One agreement: single provider across cities, so a customer in several cities needs only one agreement.
- Service levels and terms: https://www.rebootmonkey.com/en/solutions/sla
- Published case study: a major ICT provider engaged Reboot Monkey for three full infrastructure rollouts in Lahore, Karachi and Islamabad, with the hardware installed the same day at every site. Read the case study at https://www.rebootmonkey.com/en/resources/case-study/how-we-completed-3-full-deployments-across-pakistan
Data Center Migration
The data centres we work in hold their own certifications, such as ISO/IEC 27001 and ISO 9001. Ask us for the certificate of your site.
Frequently Asked Questions
What does data center migration cover in Vienna?
Data center migration in Vienna covers moving servers and network equipment between racks, rooms or facilities. Reboot Monkey engineers can run the whole physical move or work alongside your own team, and who disconnects, reconnects and tests the equipment is agreed per project. Related work such as rack and stack, cabling and decommissioning of retired hardware can be added to the same project.
Do you work in every datacenter in Vienna?
Reboot Monkey engineers work in any facility in Vienna where the customer has equipment and access, under the operator's own access and safety rules. The customer adds the engineers to the facility's access list before the first visit.
How fast can Reboot Monkey respond in Vienna?
Incidents and unplanned requests are handled under a 1-hour, around-the-clock incident response SLA. There is also a 15 minute premium response available where technicians are stationed on-site, as a paid add-on. On-site, dispatch and resolution times, priority tiers, and planned or scheduled work are agreed per site in the service agreement.
How is Reboot Monkey different from the facility operator's own staff?
Facility operators' own technicians work for the building. Reboot Monkey engineers work for the customer: they are independent from facility operators (not Equinix SmartHands, not NTT staff), follow the customer's instructions, and the same team can cover several buildings in the city under one agreement.
How do I get started with data center migration in Vienna?
Send the site, the equipment and the task through the contact form. Reboot Monkey replies with a quote and an engineer plan for that facility. Once agreed, the customer adds the engineers to the facility's access list and the data center migration work is scheduled under the operator's rules.
Plan your Vienna migration
Send the equipment list, the source and destination and your timing constraints, and Reboot Monkey will respond with a quote.