Skip to content

Guatemala · Guatemala City

Data Center Decommissioning in Guatemala City

Reboot Monkey removes and disposes of retired servers, switches and storage arrays from customer racks in Guatemala City. Engineers record serial numbers, asset tags and rack positions against your asset list, log every item as it leaves, and work inside the schedule the facility operator sets.

In Data Center Decommissioning

Data Center Decommissioning

  • 8

    services detailed for Guatemala City

  • 1

    agreement for every city

Plan your decommissioning in Guatemala City

Send your asset list and access constraints, and Reboot Monkey will scope the removal with you and quote it.

In depth

Data Center Decommissioning: 6 sections, open any to read more.

Data Center Decommissioning in Guatemala City

KIO Guatemala 1 (GTM1) stands on Bulevard El Naranjo in Guatemala City. Decommissioning here means taking retired hardware out of a rack that belongs to the customer, inside a building that belongs to someone else. Reboot Monkey is a third-party datacenter services operator. It does not own or run the data centre, and it does not sell hosting. The facility operator owns and runs the building, including its power, cooling and access policy, and Reboot Monkey engineers work under the operator's site rules.

For a buyer, that division of roles shapes how a decommissioning project is planned. The work is agreed with you first, then fitted to the windows the facility allows. If the facility requires out-of-hours or weekend access for removals, the date is set with you in advance rather than discovered on the day. A CTO or IT director gets one point of coordination for the physical work, and a procurement manager gets a job that is scoped against the customer's own asset list instead of an open-ended site visit.

Decommissioning is the removal and disposal of retired hardware. It is distinct from server migration, which moves equipment between racks, rooms or facilities and keeps it in service. If some of your estate is leaving the room and some is moving on, the two can be scoped together, but each is planned as its own piece of work.

Datacenter Facilities in Guatemala City

Data centres in Guatemala City, ordered by the number of networks present:

  • KIO Guatemala 1 (GTM1), Bulevard El Naranjo, Condado El Naranjo, GT Guatemala City: 15 networks; carriers EdgeUno
  • Telefonica POP Guatemala (Telxius Cable), Aguilar Batre, Zona 11, 0000 Guatemala City: 1 network
  • Cloud2Nube, 46 calle 24-50 zona 12, Zentro Plaza Sur, 01012 Guatemala City
  • Datacenter Zona 15 (INTERNET TELECOMUNICATION COMPANY DE GUATEMALA, S.A.), Edificio Aristos de Reforma, Avenida La Reforma 7-69, Zona 15, 01015 Guatemala City
  • Navégalo Data Center Guatemala (GT1), Mix Condado, El Naranjo, 10000 Guatemala City

Our Data Center Decommissioning Services

A decommissioning job in Guatemala City follows a fixed sequence, and each step produces a record you can check against your own inventory.

  • Asset recording: serial numbers, asset tags and rack positions are recorded against the customer's asset list before anything is touched, so the starting position is documented.
  • Scheduling: removal is scheduled with the customer in advance, including any out-of-hours or weekend windows the facility requires.
  • Scope of removal: decommissioning covers servers, switches, storage arrays, and their cabling and rail kits, so the rack is left clear rather than half stripped.
  • Item logging: every item is logged as it is removed, which gives you a running account of what has left the rack and when.
  • Backup cover: a second, briefed Reboot Monkey engineer is named as backup for every customer site, so a single absence does not stall a scheduled removal.
  • Disposal route: where retired equipment needs data wiping, on-site shredding or degaussing, collection and transport, or resale and buyback quoted case by case, that is IT asset disposition (ITAD). Reboot Monkey staff process it in a partner's processing facility or on the customer's site.

Why Reboot Monkey

Reboot Monkey works as a vendor-neutral operator inside other companies' data centres. Its field engineers are not tied to the facility that houses your racks, which matters when your equipment, your carriers and your landlord are all different parties. Decommissioning is one of several physical services the company delivers on customer equipment, alongside remote hands, smart hands, rack and stack, and hardware monitoring, so a project that begins with removal can continue into the next phase without a change of supplier.

On coverage, as of 2026, Reboot Monkey's field engineers work in 190 countries and more than 400 locations. A company running estates in several countries can therefore use one operator for its Guatemala City work and for sites elsewhere, with the same recording and logging method applied each time.

The commercial side is kept plain. Prices are quoted on request and depend on the customer and the size of the job, so a quote reflects your actual rack count and the access windows involved. To start, send the asset list you hold, the racks concerned and any access constraints you already know about, and the scope can be set against that list.

How Reboot Monkey Works

These terms apply in every facility in Guatemala City where Reboot Monkey engineers work.

  • Response: 1-hour, around-the-clock incident response SLA, and a 15 minute premium response available where technicians are stationed on-site, as a paid add-on. The incident response SLA covers incidents and unplanned requests; on-site, dispatch and resolution times, priority tiers, and planned or scheduled work are agreed per site in the service agreement.
  • Monitoring: 24/7 NOC monitoring across all facilities, covering IPMI, iDRAC, SNMP, temperature, power, network signals.
  • Hardware: vendor-neutral technicians for Dell, HP, Cisco, Juniper and Arista equipment.
  • Independence: independent from facility operators (not Equinix SmartHands, not NTT staff).
  • One agreement: single provider across cities, so a customer in several cities needs only one agreement.
  • Service levels and terms: https://www.rebootmonkey.com/en/solutions/sla
  • Published case study: a major ICT provider engaged Reboot Monkey for three full infrastructure rollouts in Lahore, Karachi and Islamabad, with the hardware installed the same day at every site. Read the case study at https://www.rebootmonkey.com/en/resources/case-study/how-we-completed-3-full-deployments-across-pakistan

Data sanitization and certificates

The data centres we work in hold their own certifications, such as ISO/IEC 27001 and ISO 9001. Ask us for the certificate of your site.

  • NIST SP 800-88 data sanitization
  • Certificate of Destruction issued per storage device processed

Frequently Asked Questions

What does data center decommissioning cover in Guatemala City?

It covers removing and disposing of retired hardware from the customer's racks: servers, switches, storage arrays, and their cabling and rail kits. Serial numbers, asset tags and rack positions are recorded against the customer's asset list, and every item is logged as it is removed. Removal is scheduled with the customer in advance, including any out-of-hours or weekend windows the facility requires.

Do you work in every datacenter in Guatemala City?

Reboot Monkey engineers work in any facility in Guatemala City where the customer has equipment and access, under the operator's own access and safety rules. The customer adds the engineers to the facility's access list before the first visit.

How fast can Reboot Monkey respond in Guatemala City?

Incidents and unplanned requests are handled under a 1-hour, around-the-clock incident response SLA. There is also a 15 minute premium response available where technicians are stationed on-site, as a paid add-on. On-site, dispatch and resolution times, priority tiers, and planned or scheduled work are agreed per site in the service agreement.

How is Reboot Monkey different from the facility operator's own staff?

Facility operators' own technicians work for the building. Reboot Monkey engineers work for the customer: they are independent from facility operators (not Equinix SmartHands, not NTT staff), follow the customer's instructions, and the same team can cover several buildings in the city under one agreement.

How do I get started with data center decommissioning in Guatemala City?

Send the site, the equipment and the task through the contact form. Reboot Monkey replies with a quote and an engineer plan for that facility. Once agreed, the customer adds the engineers to the facility's access list and the data center decommissioning work is scheduled under the operator's rules.

Plan your decommissioning in Guatemala City

Send your asset list and access constraints, and Reboot Monkey will scope the removal with you and quote it.

Published:

Get a quote