
Photo: Ayorinde Ogundele · CC BY-SA 4.0 · cropped · source
Nigeria · Lagos
Data Center Decommissioning in Lagos
Data center decommissioning in Lagos means removing and disposing of retired hardware from a facility. Reboot Monkey engineers record each asset against your list, remove servers, switches and storage arrays with their cabling and rail kits, and log every item as it leaves the rack.
In Data Center Decommissioning
- Data Center Decommissioning
- Colocation
- Data Center Migration
- Rack and Stack
- Remote Hands
- Server Migration
- Smart Hands
- ITADon request
Data Center Decommissioning
8
services detailed for Lagos
1
agreement for every city
Plan your Lagos decommissioning
Send your asset list and the facility you are leaving. Prices are quoted on request and depend on the customer and the size of the job.
In depth
Data Center Decommissioning: 6 sections, open any to read more.
Data Center Decommissioning in Lagos
Digital Realty Lagos (LOS1-2) stands on Saka Tinubu Street Victoria Island in Lagos. A decommissioning project in this city usually starts from one question: which equipment is still in the racks, who owns it, and where does it go next. Reboot Monkey is a third-party datacenter services operator. It does not own or run the buildings it works in, so the project is organised around your asset list and the site rules of the facility operator, not around a hosting platform or a building of our own.
The facility operator owns and runs the building, including its power, cooling and access policy, and Reboot Monkey engineers work under the operator's site rules. That shapes the plan from the first call. Access steps, loading arrangements and any restricted periods are agreed with you before anyone is dispatched, so the removal date is fixed against the operator's requirements and not discovered on the day.
The work is scoped to retired hardware: servers, switches, storage arrays, and their cabling and rail kits. If the same site also needs equipment moved to another rack, room or facility, that is a separate piece of work described as server migration, and it can be planned alongside the decommissioning so that one engineer visit does not undo the other.
- Removal of retired servers, switches and storage arrays
- Removal of their cabling and rail kits
- Scheduling agreed with you in advance, including out-of-hours or weekend windows the facility requires
Datacenter Facilities in Lagos
Data centres in Lagos, ordered by the number of networks present:
- Digital Realty Lagos (LOS1-2), 8A Saka Tinubu Street Victoria Island, 101212 Lagos: 67 networks; carriers Orange Wholesale International - EVPL
- OADC LOS1 - Lagos (Open Access Data Centres), Yemi Adetayo Street, Lekki Penninsula II, 105102 Lagos: 27 networks
- Africa Data Centres, Lagos LOS1, Nigeria, Harbour Lgt, 106104, Inupa Kekere, Harbour Lights, Eko Atlantic City, NA Lagos: 11 networks
- Cloud Exchange West Africa (Cloud Exchange West Africa limited), 17 Lugard Ave, Ikoyi 106104, 101233 Lagos: 4 networks
- Broadbased Communications (Broadbased Communications Limited), 12th Floor, 15 Necom House, Marina, 101808 Lagos Island: 2 networks
- Interconnect Nigeria (Internet eXchange Point of Nigeria Ltd.), 15th floor, NECOM House, 15 Marina, Lagos, 100221: 1 network
- Choice2mobile Technology Ltd (De Choicetech Integrated Ltd), 16b Akinola Adegunwa Street, Ikeja, 100271 Lagos
- NCR-Marina (Internet eXchange Point of Nigeria Ltd.), 8th Floor, NCR Building, 6 Broad Street, 101001 Lagos
- Ninext Data Center (Brainshare Technologies and Services Nigeria Limited), 15 Marina Rd, 101001 Lagos
- Swift Networks Lagos (Swift Networks Limited), 31B SAKA TINUBU STREET, VICTORIA ISLAND, 12345 Lagos
Our Data Center Decommissioning Services
Decommissioning with Reboot Monkey is a defined sequence, and each step leaves a record you can reconcile against your own inventory.
First, serial numbers, asset tags and rack positions are recorded against your asset list. This is the baseline: it tells you what was in the room before any work starts and makes any difference between your list and the physical racks visible early, while it can still be corrected.
Second, removal is scheduled with you in advance. Where the facility requires out-of-hours or weekend windows, those are built into the plan. Prices are quoted on request and depend on the customer and the size of the job, so the scope you describe is what the quote is based on.
Third, engineers remove the equipment and log every item as it is removed. The log is the proof of work: what left, from which rack position, in what order. A second, briefed Reboot Monkey engineer is named as backup for every customer site, so the job does not depend on one person being available on the day.
Where retired hardware also needs data wiping, on-site shredding or degaussing, collection and transport, or resale and buyback quoted case by case, that falls under IT asset disposition (ITAD). It is processed by Reboot Monkey staff in a partner's processing facility or on your site, and it can be ordered together with the removal.
- Asset recording: serial numbers, asset tags and rack positions against your list
- Scheduled removal, agreed with you in advance
- Item-by-item log as hardware is removed
- Named backup engineer for the site
Why Reboot Monkey
Reboot Monkey sells rack space, IP transit, leased IP addresses, network, data-centre hardware and the services that deliver, install and support them, inside data centres that other companies own and run. It is not a hosting company and not a datacenter owner. For a decommissioning buyer, this means the people removing your hardware are the same operator that can install, patch and support equipment elsewhere in your estate, under one set of working practices.
As of 2026, Reboot Monkey's field engineers work in 190 countries and more than 400 locations. For a company retiring equipment in Lagos as part of a wider consolidation, the same method of recording, scheduling and logging applies at your other sites, so the paperwork looks the same wherever the racks are.
If the retired hardware is being replaced, the new equipment can be handled by the same engineers through rack and stack, and the network for the replacement racks is ordered from the facility operator and the carriers present in the facility, with Reboot Monkey engineers installing and patching the cabling in your rack. Decommissioning and installation then run as one plan instead of two separate vendor engagements.
To start, send your asset list and the facility you are leaving, and ask for a quote through the contact page.
How Reboot Monkey Works
These terms apply in every facility in Lagos where Reboot Monkey engineers work.
- Response: 1-hour, around-the-clock incident response SLA, and a 15 minute premium response available where technicians are stationed on-site, as a paid add-on. The incident response SLA covers incidents and unplanned requests; on-site, dispatch and resolution times, priority tiers, and planned or scheduled work are agreed per site in the service agreement.
- Monitoring: 24/7 NOC monitoring across all facilities, covering IPMI, iDRAC, SNMP, temperature, power, network signals.
- Hardware: vendor-neutral technicians for Dell, HP, Cisco, Juniper and Arista equipment.
- Independence: independent from facility operators (not Equinix SmartHands, not NTT staff).
- One agreement: single provider across cities, so a customer in several cities needs only one agreement.
- Service levels and terms: https://www.rebootmonkey.com/en/solutions/sla
- Published case study: a major ICT provider engaged Reboot Monkey for three full infrastructure rollouts in Lahore, Karachi and Islamabad, with the hardware installed the same day at every site. Read the case study at https://www.rebootmonkey.com/en/resources/case-study/how-we-completed-3-full-deployments-across-pakistan
Data sanitization and certificates
The data centres we work in hold their own certifications, such as ISO/IEC 27001 and ISO 9001. Ask us for the certificate of your site.
- NIST SP 800-88 data sanitization
- Certificate of Destruction issued per storage device processed
Frequently Asked Questions
What does data center decommissioning cover in Lagos?
Decommissioning covers removing and disposing of retired hardware: servers, switches, storage arrays, and their cabling and rail kits. Serial numbers, asset tags and rack positions are recorded against your asset list, removal is scheduled with you in advance, and every item is logged as it is removed. Prices are quoted on request and depend on the customer and the size of the job.
Do you work in every datacenter in Lagos?
Reboot Monkey engineers work in any facility in Lagos where the customer has equipment and access, under the operator's own access and safety rules. The customer adds the engineers to the facility's access list before the first visit.
How fast can Reboot Monkey respond in Lagos?
Incidents and unplanned requests are handled under a 1-hour, around-the-clock incident response SLA. There is also a 15 minute premium response available where technicians are stationed on-site, as a paid add-on. On-site, dispatch and resolution times, priority tiers, and planned or scheduled work are agreed per site in the service agreement.
How is Reboot Monkey different from the facility operator's own staff?
Facility operators' own technicians work for the building. Reboot Monkey engineers work for the customer: they are independent from facility operators (not Equinix SmartHands, not NTT staff), follow the customer's instructions, and the same team can cover several buildings in the city under one agreement.
How do I get started with data center decommissioning in Lagos?
Send the site, the equipment and the task through the contact form. Reboot Monkey replies with a quote and an engineer plan for that facility. Once agreed, the customer adds the engineers to the facility's access list and the data center decommissioning work is scheduled under the operator's rules.
Data Center Decommissioning nearby
Other services in Lagos
Plan your Lagos decommissioning
Send your asset list and the facility you are leaving. Prices are quoted on request and depend on the customer and the size of the job.