Server migration in Lima means moving equipment between racks, rooms or facilities. Reboot Monkey engineers carry out the physical move inside data centres that other companies own and run, either as the whole project or alongside your own team.
In Server Migration
- Server Migration
- Colocation
- Data Center Decommissioning
- Data Center Migration
- Rack and Stack
- Remote Hands
- Smart Hands
- ITADon request
Server Migration
8
services detailed for Lima
1
agreement for every city
Plan your server migration in Lima
Send the source, destination and target window, and Reboot Monkey will confirm how the physical work is split.
In depth
Server Migration: 6 sections, open any to read more.
Server Migration in Lima
GTD Peru Data Center stands on Calle Enrique Villanueva NRO in Lima. For a buyer planning a move there, the question is who handles the physical work and how the project is divided. Reboot Monkey defines server migration as moving equipment between racks, rooms or facilities. The work is physical: equipment is taken out of one position, transported or re-seated, and installed in its new position, with the cabling re-run to match the plan agreed for the project. Reboot Monkey does not own or operate data centres and is not a hosting company. It is a third-party datacenter services operator, so a migration in Lima happens inside a building that another company owns and runs. That arrangement is the same whether the move is within one hall or between two facilities, and it shapes how access, timing and handover are arranged with you before any hardware is touched. A migration is rarely a single task. It usually combines removal from an existing rack, handling and transport, and installation at the destination. Because Reboot Monkey also performs rack and stack work, the installation end of a move uses the same mounting and cabling practice as a new deployment.
Datacenter Facilities in Lima
Data centres in Lima, ordered by the number of networks present:
- IPTP, San Isidro, Lima, Peru (IPTP Networks), 114 Golondrinas, 15047 San Isidro Lima: 12 networks
- GTD Peru Data Center, Calle Enrique Villanueva NRO. 105, 15039 Lima: 9 networks
- EdgeUno Datacenter Lima Peru (LIM1) (EdgeUno, Inc.), Avenue Manuel Olguin 395, 15047 Lima: 8 networks; carriers EdgeUno
- PIT Peru Manuel Olguin PIX, Av. Manuel Olguin 395, 423432 Lima: 7 networks
- Internexa Lima San Juan (InterNexa Peru), Prolog. Pedro Miotta 421 – San Juan de Miraflores, 511 Lima: 5 networks
- Internexa Lima Surco (Americatel), Calle Centauro 115 Urb. Los Granados – Santiago de Surco, 511 Lima: 4 networks
- Telefónica Data Center (TIC Monterrico) Peru (Telefonica Del Perú S.A.A.), Jirón Cruz del Sur 137, Santiago de Surco, 15023 Lima: 3 networks
- America Movil Telepuerto VES (CLARO PERU), Av El Sol 2246, Villa EL Salvador, 15842 Lima
- WIN Empresas, Calle Carlos Krumdieck 287, La Victoria, 01 Lima
Our Server Migration Services
Reboot Monkey can run the whole physical move or work alongside your own team. Who disconnects, reconnects and tests the equipment is agreed per project, so the split of responsibility is written down before the work starts rather than assumed on the day. This matters most when your staff hold the application knowledge and Reboot Monkey supplies the hands on site, or when the entire move is handed over.
The services around a migration are available under the same engagement:
- Moving equipment between racks, rooms or facilities, with removal, handling and re-installation.
- Rack and stack at the destination: installing, mounting and cabling the hardware in its new position.
- Cabling and connectivity: Reboot Monkey engineers install and patch the cabling in your rack, and Reboot Monkey orders the cross connects and carrier circuits from the facility operator and the carriers present in the facility.
- Smart hands where a step needs diagnostic judgement and configuration knowledge, and remote hands for reboots, cable checks, component swaps and visual checks after the move.
- Data center decommissioning and IT asset disposition for the equipment left behind, when an old site or old hardware is being retired as part of the migration.
Why Reboot Monkey
Reboot Monkey is vendor-neutral and sits between you and the facility. Its position is that of a services operator inside other companies' data centres, which means the migration is planned around the operator's rules and not around a building Reboot Monkey owns. As of 2026, Reboot Monkey's field engineers work in 190 countries and more than 400 locations, so a move that starts in Lima and ends elsewhere can be handled under one working method.
Continuity is built into every customer site: a second, briefed Reboot Monkey engineer is named as backup. If the engineer assigned to your migration is unavailable, the backup already knows the site and the plan, which avoids a restart of the briefing on the day of the move.
Commercial terms are kept simple. Prices are quoted on request and depend on the customer and the size of the job, so the quote reflects your actual scope: the number of racks, the distance between source and destination, and how much of the work your own team keeps. To scope a migration in Lima, send the current layout, the destination and the target window, and Reboot Monkey will confirm how the physical work is split.
How Reboot Monkey Works
These terms apply in every facility in Lima where Reboot Monkey engineers work.
- Response: 1-hour, around-the-clock incident response SLA, and a 15 minute premium response available where technicians are stationed on-site, as a paid add-on. The incident response SLA covers incidents and unplanned requests; on-site, dispatch and resolution times, priority tiers, and planned or scheduled work are agreed per site in the service agreement.
- Monitoring: 24/7 NOC monitoring across all facilities, covering IPMI, iDRAC, SNMP, temperature, power, network signals.
- Hardware: vendor-neutral technicians for Dell, HP, Cisco, Juniper and Arista equipment.
- Independence: independent from facility operators (not Equinix SmartHands, not NTT staff).
- One agreement: single provider across cities, so a customer in several cities needs only one agreement.
- Service levels and terms: https://www.rebootmonkey.com/en/solutions/sla
- Published case study: a major ICT provider engaged Reboot Monkey for three full infrastructure rollouts in Lahore, Karachi and Islamabad, with the hardware installed the same day at every site. Read the case study at https://www.rebootmonkey.com/en/resources/case-study/how-we-completed-3-full-deployments-across-pakistan
Server Migration
The data centres we work in hold their own certifications, such as ISO/IEC 27001 and ISO 9001. Ask us for the certificate of your site.
Frequently Asked Questions
What does server migration cover in Lima?
Server migration covers moving equipment between racks, rooms or facilities. Reboot Monkey can run the whole physical move or work alongside your own team, and who disconnects, reconnects and tests the equipment is agreed per project. Engineers work under the facility operator's site rules, and rack and stack, cabling and decommissioning can be added to the same job.
Do you work in every datacenter in Lima?
Reboot Monkey engineers work in any facility in Lima where the customer has equipment and access, under the operator's own access and safety rules. The customer adds the engineers to the facility's access list before the first visit.
How fast can Reboot Monkey respond in Lima?
Incidents and unplanned requests are handled under a 1-hour, around-the-clock incident response SLA. There is also a 15 minute premium response available where technicians are stationed on-site, as a paid add-on. On-site, dispatch and resolution times, priority tiers, and planned or scheduled work are agreed per site in the service agreement.
How is Reboot Monkey different from the facility operator's own staff?
Facility operators' own technicians work for the building. Reboot Monkey engineers work for the customer: they are independent from facility operators (not Equinix SmartHands, not NTT staff), follow the customer's instructions, and the same team can cover several buildings in the city under one agreement.
How do I get started with server migration in Lima?
Send the site, the equipment and the task through the contact form. Reboot Monkey replies with a quote and an engineer plan for that facility. Once agreed, the customer adds the engineers to the facility's access list and the server migration work is scheduled under the operator's rules.