Skip to content

Puerto Rico · San Juan

Data Center Decommissioning in San Juan

Reboot Monkey removes and disposes of retired servers, switches and storage arrays from your racks in San Juan. Each item is recorded against your asset list as it leaves, and removal is scheduled with you in advance, including any out-of-hours windows the facility requires.

In Data Center Decommissioning

Data Center Decommissioning

  • 8

    services detailed for San Juan

  • 1

    agreement for every city

Plan your decommissioning in San Juan

Send the asset list and the site details, and Reboot Monkey will quote the job.

In depth

Data Center Decommissioning: 6 sections, open any to read more.

Data Center Decommissioning in San Juan

NetWave PR stands on Avenida De La Constitución in San Juan. When a company retires equipment in a facility like this one, the hardware does not leave by itself: someone has to unrack it, trace every cable, and account for each asset before it goes. Reboot Monkey is a third-party datacenter services operator, not a hosting company and not a datacenter owner, so the racks being cleared belong to the customer and the building belongs to the facility operator.

Data center decommissioning, in Reboot Monkey's terms, means removing and disposing of retired hardware. It is a physical job with a record attached. The record matters to a CTO closing out a contract, to an IT director reconciling an asset register, and to a procurement manager who needs to show what left the building and when.

The facility operator owns and runs the building, including its power, cooling and access policy, and Reboot Monkey engineers work under the operator's site rules. That shapes how a removal is planned: the customer and Reboot Monkey agree the timing first, and the timing follows what the site allows.

Datacenter Facilities in San Juan

Data centres in San Juan, ordered by the number of networks present:

  • NetWave PR (Netwave Equipment Corporation), 316 Avenida De La Constitución, 00901 San Juan: 8 networks; carriers FiberX
  • Claro Puerto Rico, 1513 Roosevelt Avenue, 00920 San Juan: 3 networks; carriers FiberX
  • EdgeUno Datacenter San Juan Puerto Rico (SJU1) (EdgeUno, Inc.), 17 Calle Prudencio, San Juan Puerto Rico. 3er piso. Avenida Juan Ponce de Leon despues lado opuesto calle Santiago, Iglesia, San Juan, 00917, Puerto Rico: 3 networks; carriers EdgeUno
  • Critical Hub DataCenter (Critical Hub Networks, Inc.), 1314 Ponce de Leon AVe., 00907 San Juan: 2 networks
  • Claro SJU-01 (Claro-PRTC), Mario Julia Industrial Park 390 Calle A, 00920 San Juan; carriers FiberX
  • Gigifi Networks (Gigifiber Networks, LLC), Carr. PR #1 Km. 24.2 Bo. Quebrada Arenas Sector Buen Pastor, 00926 San Juan

Our Data Center Decommissioning Services

A decommissioning job in San Juan starts with the customer's asset list. Reboot Monkey engineers work from that list on site, so the scope of the job is the scope of the list, and anything that does not match is raised with the customer before it is touched.

The work is carried out in the following way, and each step produces a record the customer can check.

  • Serial numbers, asset tags and rack positions are recorded against the customer's asset list.
  • Removal is scheduled with the customer in advance, including any out-of-hours or weekend windows the facility requires.
  • Decommissioning covers servers, switches, storage arrays, and their cabling and rail kits.
  • Every item is logged as it is removed.

Why Reboot Monkey

Decommissioning rarely stands alone. Retired hardware often has to be moved, wiped or resold, and Reboot Monkey covers the neighbouring work under the same engineers and the same records. Server migration moves equipment between racks, rooms or facilities. IT asset disposition (ITAD) covers data wiping, on-site shredding or degaussing, collection and transport, and resale or buyback quoted case by case, all processed by Reboot Monkey staff in a partner's processing facility or on the customer's site.

A second, briefed Reboot Monkey engineer is named as backup for every customer site, so a removal scheduled for a narrow window does not depend on one person being available. Where the retired equipment was connected to carriers, Reboot Monkey orders the cross connects and carrier circuits from the facility operator and the carriers present in the facility, and its engineers install and patch the cabling in the customer's rack, which keeps the end of a circuit and the end of a server in one set of hands.

As of 2026, Reboot Monkey's field engineers work in 190 countries and more than 400 locations. Prices are quoted on request and depend on the customer and the size of the job, so a quote starts from the asset list and the site rather than from a standard package.

How Reboot Monkey Works

These terms apply in every facility in San Juan where Reboot Monkey engineers work.

  • Response: 1-hour, around-the-clock incident response SLA, and a 15 minute premium response available where technicians are stationed on-site, as a paid add-on. The incident response SLA covers incidents and unplanned requests; on-site, dispatch and resolution times, priority tiers, and planned or scheduled work are agreed per site in the service agreement.
  • Monitoring: 24/7 NOC monitoring across all facilities, covering IPMI, iDRAC, SNMP, temperature, power, network signals.
  • Hardware: vendor-neutral technicians for Dell, HP, Cisco, Juniper and Arista equipment.
  • Independence: independent from facility operators (not Equinix SmartHands, not NTT staff).
  • One agreement: single provider across cities, so a customer in several cities needs only one agreement.
  • Service levels and terms: https://www.rebootmonkey.com/en/solutions/sla
  • Published case study: a major ICT provider engaged Reboot Monkey for three full infrastructure rollouts in Lahore, Karachi and Islamabad, with the hardware installed the same day at every site. Read the case study at https://www.rebootmonkey.com/en/resources/case-study/how-we-completed-3-full-deployments-across-pakistan

Data sanitization and certificates

The data centres we work in hold their own certifications, such as ISO/IEC 27001 and ISO 9001. Ask us for the certificate of your site.

  • NIST SP 800-88 data sanitization
  • Certificate of Destruction issued per storage device processed

Frequently Asked Questions

What does data center decommissioning cover in San Juan?

Decommissioning covers servers, switches, storage arrays, and their cabling and rail kits. Reboot Monkey records serial numbers, asset tags and rack positions against the customer's asset list, logs every item as it is removed, and schedules removal in advance with the customer, including any out-of-hours or weekend windows the facility requires.

Do you work in every datacenter in San Juan?

Reboot Monkey engineers work in any facility in San Juan where the customer has equipment and access, under the operator's own access and safety rules. The customer adds the engineers to the facility's access list before the first visit.

How fast can Reboot Monkey respond in San Juan?

Incidents and unplanned requests are handled under a 1-hour, around-the-clock incident response SLA. There is also a 15 minute premium response available where technicians are stationed on-site, as a paid add-on. On-site, dispatch and resolution times, priority tiers, and planned or scheduled work are agreed per site in the service agreement.

How is Reboot Monkey different from the facility operator's own staff?

Facility operators' own technicians work for the building. Reboot Monkey engineers work for the customer: they are independent from facility operators (not Equinix SmartHands, not NTT staff), follow the customer's instructions, and the same team can cover several buildings in the city under one agreement.

How do I get started with data center decommissioning in San Juan?

Send the site, the equipment and the task through the contact form. Reboot Monkey replies with a quote and an engineer plan for that facility. Once agreed, the customer adds the engineers to the facility's access list and the data center decommissioning work is scheduled under the operator's rules.

Plan your decommissioning in San Juan

Send the asset list and the site details, and Reboot Monkey will quote the job.

Published:

Get a quote