Bangladesh · Dhaka
Data Center Migration in Dhaka
Data center migration in Dhaka means moving servers, storage and network equipment between racks, rooms or facilities. Reboot Monkey can run the whole physical move or work alongside your own team, with the split of tasks agreed per project before the move starts.
In Data Center Migration
- Data Center Migration
- Colocation
- Data Center Decommissioning
- Rack and Stack
- Remote Hands
- Server Migration
- Smart Hands
- ITADon request
Data Center Migration
8
services detailed for Dhaka
1
agreement for every city
Plan your data center migration
Tell us what is moving and where it is going. Prices are quoted on request and depend on the customer and the size of the job.
In depth
Data Center Migration: 6 sections, open any to read more.
Data Center Migration in Dhaka
BDIX Main Node - Panthapath stands on Firoz Tower in Dhaka. A move into, out of or within a facility like this is a physical project, and it starts with a plan that fixes what moves, in which order and who handles each step.
Reboot Monkey defines server migration as moving equipment between racks, rooms or facilities. A data center migration in Dhaka uses that same work at project scale: equipment is powered down in the source location, de-cabled, transported, racked in the destination and cabled again. The facility operator owns and runs the building, including its power, cooling and access policy, and Reboot Monkey engineers work under the operator's site rules, so the plan is written around the access arrangements of both the source and the destination site.
Before any hardware is touched, the project agrees an inventory of the equipment, the sequence of the move and the order in which services are brought back. Reboot Monkey is a third-party datacenter services operator, not a hosting company and not a datacenter owner. It works inside data centres that other companies own and run, which is why the migration is planned with the operator of each building rather than around it.
Datacenter Facilities in Dhaka
Data centres in Dhaka, ordered by the number of networks present:
- BDIX Main Node - Panthapath (Bangladesh Internet Exchange Trust), Firoz Tower 14th Floor, Panthapath, 1205 Dhaka: 21 networks
- Earth Telecommunication Dhaka (Earth Telecommunication Pvt. Limited), Khwaja Tower (9th Floor),95 Mohakhali C/A, 1212 Dhaka: 13 networks
- ISPAB-NIX-DC (Bangladesh Internet Service Provider Internet Exchange Trust), House 15 Level (7-8) Road 05, Block F, Banani , Dhaka-1213: 12 networks
- BTCL IX Dhaka (Bangladesh Telecommunications Company Limited(BTCL)), Outer Circular Rd, 1205 Dhaka: 10 networks
- Coloasia Ltd. (DHK1) (Global Fair Communications Ltd.), Red Crescent Borak Tower-2, (Level-10), 71-72 Old Elephant Road, 1000 Dhaka: 7 networks
- Bangladesh Submarine Cables PLC - Dhaka (Bangladesh Submarine Cables Public Limited Company (BSCPLC)), 191, Tejgaon-Gulshan Link Road, 1208 Dhaka: 6 networks
- Kloud Dhaka DC (Kloud Technologies Limited), House# 47, Street# 6, Block# C, Banani, Dhaka-1212.: 6 networks
- Aamra Dhaka DC (Aamra Technologies Limited), Safura Tower (12th Floor), 20, Kemal Ataturk Avenue, 1213 Dhaka: 5 networks
- MetroNet Bangladesh (MetroNet Bangladesh Ltd.), Ahmed Tower, 10th Floor,Kamal Ataturk Avenue, Banani, 1213 Dhaka: 4 networks
- National Data Center (Bangladesh Computer Council), ICT Tower, E-14/X, Agargaon, Sher-e-Bangla Nagar, 1207 Dhaka: 3 networks
Our Data Center Migration Services
A migration project is built from several physical services. Which of them a project needs depends on what is moving and where it is going.
- Server migration: moving equipment between racks, rooms or facilities, with the move planned per project and the roles for disconnecting, reconnecting and testing agreed beforehand.
- Rack and stack: installing, mounting and cabling new hardware in the destination racks, including replacement equipment that arrives as part of the move.
- Connectivity: Reboot Monkey orders the cross connects and carrier circuits from the facility operator and the carriers present in the facility, and its engineers install and patch the cabling in the customer's rack.
- Smart hands: technical work that needs diagnostic judgement and configuration knowledge, used when a device does not come back as expected after the move.
- Remote hands: physical tasks carried out on the customer's instruction, such as reboots, cable checks, component swaps and visual checks.
- Data center decommissioning: removing and disposing of retired hardware that is not moving to the new site.
- IT asset disposition (ITAD): data wiping, on-site shredding or degaussing, collection and transport, and resale or buyback quoted case by case, processed by Reboot Monkey staff in a partner's processing facility or on the customer's site.
- Hardware monitoring: monitoring of the customer's servers and network equipment by the Reboot Monkey NOC, which can run before, during and after the move.
Why Reboot Monkey
Reboot Monkey sells rack space, IP transit, leased IP addresses, network, data-centre hardware and the services that deliver, install and support them. For a migration this means one supplier can cover the physical move, the new rack space and the network that connects it, so the customer does not coordinate separate parties for each layer.
The division of work is agreed rather than assumed. Reboot Monkey can run the whole physical move or work alongside the customer's own team, and who disconnects, reconnects and tests the equipment is agreed per project. A customer with strong in-house systems staff can keep the logical cut-over, while Reboot Monkey handles the physical tasks on site.
Continuity during the project is covered by naming a second person. A second, briefed Reboot Monkey engineer is named as backup for every customer site, so a single absence does not stop a scheduled move.
As of 2026, Reboot Monkey's field engineers work in 190 countries and more than 400 locations. Prices are quoted on request and depend on the customer and the size of the job. To scope a move, describe the source site, the destination and the equipment involved through the contact page.
How Reboot Monkey Works
These terms apply in every facility in Dhaka where Reboot Monkey engineers work.
- Response: 1-hour, around-the-clock incident response SLA, and a 15 minute premium response available where technicians are stationed on-site, as a paid add-on. The incident response SLA covers incidents and unplanned requests; on-site, dispatch and resolution times, priority tiers, and planned or scheduled work are agreed per site in the service agreement.
- Monitoring: 24/7 NOC monitoring across all facilities, covering IPMI, iDRAC, SNMP, temperature, power, network signals.
- Hardware: vendor-neutral technicians for Dell, HP, Cisco, Juniper and Arista equipment.
- Independence: independent from facility operators (not Equinix SmartHands, not NTT staff).
- One agreement: single provider across cities, so a customer in several cities needs only one agreement.
- Service levels and terms: https://www.rebootmonkey.com/en/solutions/sla
- Published case study: a major ICT provider engaged Reboot Monkey for three full infrastructure rollouts in Lahore, Karachi and Islamabad, with the hardware installed the same day at every site. Read the case study at https://www.rebootmonkey.com/en/resources/case-study/how-we-completed-3-full-deployments-across-pakistan
Data Center Migration
The data centres we work in hold their own certifications, such as ISO/IEC 27001 and ISO 9001. Ask us for the certificate of your site.
Frequently Asked Questions
What does data center migration cover in Dhaka?
Data center migration in Dhaka covers moving equipment between racks, rooms or facilities. Reboot Monkey can run the whole physical move or work alongside the customer's own team, and who disconnects, reconnects and tests the equipment is agreed per project. Related services such as rack and stack, smart hands, decommissioning and ITAD can be added when the project needs them.
Do you work in every datacenter in Dhaka?
Reboot Monkey engineers work in any facility in Dhaka where the customer has equipment and access, under the operator's own access and safety rules. The customer adds the engineers to the facility's access list before the first visit.
How fast can Reboot Monkey respond in Dhaka?
Incidents and unplanned requests are handled under a 1-hour, around-the-clock incident response SLA. There is also a 15 minute premium response available where technicians are stationed on-site, as a paid add-on. On-site, dispatch and resolution times, priority tiers, and planned or scheduled work are agreed per site in the service agreement.
How is Reboot Monkey different from the facility operator's own staff?
Facility operators' own technicians work for the building. Reboot Monkey engineers work for the customer: they are independent from facility operators (not Equinix SmartHands, not NTT staff), follow the customer's instructions, and the same team can cover several buildings in the city under one agreement.
How do I get started with data center migration in Dhaka?
Send the site, the equipment and the task through the contact form. Reboot Monkey replies with a quote and an engineer plan for that facility. Once agreed, the customer adds the engineers to the facility's access list and the data center migration work is scheduled under the operator's rules.
Plan your data center migration
Tell us what is moving and where it is going. Prices are quoted on request and depend on the customer and the size of the job.