Skip to content

Greece · Thessaloniki

Data Center Decommissioning in Thessaloniki

Reboot Monkey removes and disposes of retired hardware from the customer's rack in Thessaloniki. Servers, switches, storage arrays, cabling and rail kits are recorded against your asset list as they come out, so the exit from a facility is documented item by item.

In Data Center Decommissioning

Data Center Decommissioning

  • 8

    services detailed for Thessaloniki

  • 1

    agreement for every city

Plan your decommissioning in Thessaloniki

Send the racks, devices and target dates. Reboot Monkey returns a quote based on the size of the job.

In depth

Data Center Decommissioning: 6 sections, open any to read more.

Data Center Decommissioning in Thessaloniki

Balkan Gate Thessaloniki stands on Stadiou Street in Thessaloniki. A decommissioning project in this city starts the same way as anywhere else: with the customer's asset list and a clear picture of what stays in the rack and what leaves it. Reboot Monkey defines data center decommissioning as removing and disposing of retired hardware. The work is carried out by Reboot Monkey engineers inside the facility where your equipment sits, under that facility's site rules. The operator owns and runs the building, including its power, cooling and access policy, and removal is planned around the access the operator allows.

Reboot Monkey is a third-party datacenter services operator. It does not host your workloads and does not own the building, so a decommissioning request is not tied to any hosting contract or to a particular facility operator. The decision to retire a rack, a room or a whole deployment stays with you, and Reboot Monkey executes it on your instruction.

A typical project in Thessaloniki begins with a written scope: which racks, which devices, and by when. From that scope the removal is scheduled with you in advance. If the facility requires out-of-hours or weekend windows, those are built into the schedule at the start rather than discovered on the day. A second, briefed Reboot Monkey engineer is named as backup for every customer site, so a single absence does not stall the removal date you agreed.

Datacenter Facilities in Thessaloniki

Data centres in Thessaloniki, ordered by the number of networks present:

  • Balkan Gate Thessaloniki (Lancom Ltd), Stadiou, 54628 Thessaloniki: 52 networks; carriers Airbeam Carrier, EXA Infrastructure, Grid Telecom, IONIAN, Inter.link and others
  • Synapsecom SNC-1 Thessaloniki (Synapsecom Telecoms S.A.), Pontou 56, 54628 Thessaloniki: 24 networks; carriers Grid Telecom and IONIAN
  • Lancom Thessaloniki DC (Lancom Ltd), Vasileos Irakliou 40, 54623 Thessaloniki: 19 networks; carriers Airbeam Carrier and NetIX
  • KLH-GSN-DC - Greekstream Networks - Thessaloniki (Ioannis Roditis trading as Greekstream Networks), Konstantinoupoleos Str., 57009 Thessaloniki: 4 networks

Our Data Center Decommissioning Services

Decommissioning covers servers, switches, storage arrays, and their cabling and rail kits. Each of these is handled as part of one controlled removal rather than as separate jobs, so nothing is left behind in the rack and nothing leaves the building without a record.

The record is the core of the service. Serial numbers, asset tags and rack positions are recorded against the customer's asset list. Every item is logged as it is removed. For a CTO or IT director this means the removal produces a reconciliation you can hold against your own inventory: what was in the rack, where it sat, and that it has been taken out. For procurement, it gives a clean basis for closing out a lease, a contract or a facility exit.

  • Servers, switches and storage arrays removed from the rack
  • Cabling and rail kits removed together with the equipment
  • Serial numbers, asset tags and rack positions recorded against your asset list
  • Each item logged as it is removed
  • Removal scheduled in advance, including out-of-hours or weekend windows the facility requires

Why Reboot Monkey

Customers with retired hardware often need more than removal. Reboot Monkey also provides IT asset disposition (ITAD): data wiping, on-site shredding or degaussing, collection and transport, and resale or buyback quoted case by case. This work is processed by Reboot Monkey staff in a partner's processing facility or on the customer's site, so the path from the rack to final disposal runs under one party.

The same engineers can handle the work around a decommissioning. If equipment is moving rather than leaving, server migration relocates it between racks, rooms or facilities. If a replacement deployment is going into the same space, rack and stack installs, mounts and cables the new hardware. Where the connectivity for a rack is being retired or changed, Reboot Monkey orders the cross connects and carrier circuits from the facility operator and the carriers present in the facility, and its engineers install and patch the cabling in the customer's rack.

As of 2026, Reboot Monkey's field engineers work in 190 countries and more than 400 locations, so a company with equipment to retire in Thessaloniki and in other countries can run the work through one provider. Prices are quoted on request and depend on the customer and the size of the job.

How Reboot Monkey Works

These terms apply in every facility in Thessaloniki where Reboot Monkey engineers work.

  • Response: 1-hour, around-the-clock incident response SLA, and a 15 minute premium response available where technicians are stationed on-site, as a paid add-on. The incident response SLA covers incidents and unplanned requests; on-site, dispatch and resolution times, priority tiers, and planned or scheduled work are agreed per site in the service agreement.
  • Monitoring: 24/7 NOC monitoring across all facilities, covering IPMI, iDRAC, SNMP, temperature, power, network signals.
  • Hardware: vendor-neutral technicians for Dell, HP, Cisco, Juniper and Arista equipment.
  • Independence: independent from facility operators (not Equinix SmartHands, not NTT staff).
  • One agreement: single provider across cities, so a customer in several cities needs only one agreement.
  • Service levels and terms: https://www.rebootmonkey.com/en/solutions/sla
  • Published case study: a major ICT provider engaged Reboot Monkey for three full infrastructure rollouts in Lahore, Karachi and Islamabad, with the hardware installed the same day at every site. Read the case study at https://www.rebootmonkey.com/en/resources/case-study/how-we-completed-3-full-deployments-across-pakistan

Data sanitization and certificates

The data centres we work in hold their own certifications, such as ISO/IEC 27001 and ISO 9001. Ask us for the certificate of your site.

  • NIST SP 800-88 data sanitization
  • Certificate of Destruction issued per storage device processed

Frequently Asked Questions

What does data center decommissioning cover in Thessaloniki?

Data center decommissioning in Thessaloniki covers the removal and disposal of retired hardware: servers, switches, storage arrays, and their cabling and rail kits. Serial numbers, asset tags and rack positions are recorded against your asset list, and every item is logged as it is removed. Removal is scheduled with you in advance, including any out-of-hours or weekend windows the facility requires.

Do you work in every datacenter in Thessaloniki?

Reboot Monkey engineers work in any facility in Thessaloniki where the customer has equipment and access, under the operator's own access and safety rules. The customer adds the engineers to the facility's access list before the first visit.

How fast can Reboot Monkey respond in Thessaloniki?

Incidents and unplanned requests are handled under a 1-hour, around-the-clock incident response SLA. There is also a 15 minute premium response available where technicians are stationed on-site, as a paid add-on. On-site, dispatch and resolution times, priority tiers, and planned or scheduled work are agreed per site in the service agreement.

How is Reboot Monkey different from the facility operator's own staff?

Facility operators' own technicians work for the building. Reboot Monkey engineers work for the customer: they are independent from facility operators (not Equinix SmartHands, not NTT staff), follow the customer's instructions, and the same team can cover several buildings in the city under one agreement.

How do I get started with data center decommissioning in Thessaloniki?

Send the site, the equipment and the task through the contact form. Reboot Monkey replies with a quote and an engineer plan for that facility. Once agreed, the customer adds the engineers to the facility's access list and the data center decommissioning work is scheduled under the operator's rules.

Plan your decommissioning in Thessaloniki

Send the racks, devices and target dates. Reboot Monkey returns a quote based on the size of the job.

Published:

Get a quote