Skip to content

North Macedonia · Skopje

Server Migration in Skopje

Server migration in Skopje means moving equipment between racks, rooms or facilities. Reboot Monkey engineers carry out the physical move inside the data centre, either end to end or alongside your own team, with the split of tasks agreed for each project.

Server Migration

  • 8

    services detailed for Skopje

  • 1

    agreement for every city

Plan your move in Skopje

Send the source, the destination and the equipment list, and Reboot Monkey will agree who does what for the physical move.

In depth

Server Migration: 6 sections, open any to read more.

Server Migration in Skopje

Neotel DC Skopje stands on Kuzman Josifovski Pitu in Skopje. For a CTO or IT director planning a move in or out of a Skopje facility, the first question is who does what on the day. Reboot Monkey defines server migration as moving equipment between racks, rooms or facilities, and the work is physical: powering down, unracking, transporting, racking, cabling and bringing hardware back up in its new position. Reboot Monkey is a third-party datacenter services operator. It sells rack space, IP transit, leased IP addresses, network and data-centre hardware, together with the services that deliver, install and support them, inside data centres that other companies own and run. It is not a hosting company and it does not own datacenters. For a migration this has a practical consequence: the move is planned around the facility you are leaving and the facility you are entering, and each facility operator keeps control of its own building. Access approvals, delivery routes and working conditions therefore follow the operator's procedures at the site in question, and the project plan is written to fit them.

Datacenter Facilities in Skopje

Data centres in Skopje, ordered by the number of networks present:

  • Neotel DC Skopje (Neotel DOO export-import Skopje), Kuzman Josifovski Pitu 15, 1000 Skopje: 3 networks
  • Faculty of Computer Science and Engineering (Faculty of Computer Science and Engineering, Ss. Cyril and Methodius University in Skopje), "Rugjer Boshkovikj" 16, P.O. Box 393, 1000 Skopje: 2 networks
  • Telesmart DC Skopje (Telesmart Telekom doo), Bul. Kiro Gligorov 4, Bul. Nikola Parapunov bb, 1000 Skopje: 2 networks
  • Ss. Cyril and Methodius University - Rectorate (Faculty of Computer Science and Engineering, Ss. Cyril and Methodius University in Skopje), blvd. Goce Delcev 9, 1000 Skopje: 1 network

Our Server Migration Services

A migration is rarely one task. Reboot Monkey scopes it as a set of physical activities and agrees with you which of them its engineers perform. Reboot Monkey can run the whole physical move or work alongside the customer's own team. Who disconnects, reconnects and tests the equipment is agreed per project, so a team that wants to keep control of cutover testing can do so, and a team that wants a single party responsible for the whole move can have that.

Typical building blocks of a migration project include:

  • Moving servers and network equipment between racks or rooms within a facility.
  • Moving equipment from one facility to another, including the transport leg.
  • Re-cabling in the destination rack, with Reboot Monkey engineers installing and patching the cabling in your rack.
  • Ordering cross connects and carrier circuits for the new location from the facility operator and the carriers present in the facility, so connectivity is ready when the hardware arrives.
  • Mounting new hardware at the destination through rack and stack, where the move is combined with a refresh.
  • Removing and disposing of retired hardware through data center decommissioning once the move is complete.

Why Reboot Monkey

The first reason is coverage. As of 2026, Reboot Monkey's field engineers work in 190 countries and more than 400 locations. A migration that starts in Skopje and ends in another country can therefore be handled under one set of arrangements instead of being split between separate local contractors.

The second is continuity on the day. A second, briefed Reboot Monkey engineer is named as backup for every customer site. If the primary engineer is unavailable, the project does not wait on a new introduction to your racks and your plan.

The third is that the move does not stop at the rack. Because Reboot Monkey also sells network, IP transit and leased IP addresses, the connectivity side of a migration can be arranged together with the physical work, rather than by a separate provider who does not know the project timetable. Monitoring of your servers and network equipment by the Reboot Monkey NOC is available as a service when you want the equipment watched after it has been moved.

Prices are quoted on request and depend on the customer and the size of the job. Describe the source and destination, the amount of equipment and your preferred split of responsibilities, and Reboot Monkey will respond with a quote for the physical move.

How Reboot Monkey Works

These terms apply in every facility in Skopje where Reboot Monkey engineers work.

  • Response: 1-hour, around-the-clock incident response SLA, and a 15 minute premium response available where technicians are stationed on-site, as a paid add-on. The incident response SLA covers incidents and unplanned requests; on-site, dispatch and resolution times, priority tiers, and planned or scheduled work are agreed per site in the service agreement.
  • Monitoring: 24/7 NOC monitoring across all facilities, covering IPMI, iDRAC, SNMP, temperature, power, network signals.
  • Hardware: vendor-neutral technicians for Dell, HP, Cisco, Juniper and Arista equipment.
  • Independence: independent from facility operators (not Equinix SmartHands, not NTT staff).
  • One agreement: single provider across cities, so a customer in several cities needs only one agreement.
  • Service levels and terms: https://www.rebootmonkey.com/en/solutions/sla
  • Published case study: a major ICT provider engaged Reboot Monkey for three full infrastructure rollouts in Lahore, Karachi and Islamabad, with the hardware installed the same day at every site. Read the case study at https://www.rebootmonkey.com/en/resources/case-study/how-we-completed-3-full-deployments-across-pakistan

Server Migration

The data centres we work in hold their own certifications, such as ISO/IEC 27001 and ISO 9001. Ask us for the certificate of your site.

Frequently Asked Questions

What does server migration cover in Skopje?

Server migration covers moving equipment between racks, rooms or facilities. In Skopje, Reboot Monkey engineers handle the physical work inside the data centre under the facility operator's site rules. They can run the whole move or work alongside your team, and who disconnects, reconnects and tests the equipment is agreed per project.

Do you work in every datacenter in Skopje?

Reboot Monkey engineers work in any facility in Skopje where the customer has equipment and access, under the operator's own access and safety rules. The customer adds the engineers to the facility's access list before the first visit.

How fast can Reboot Monkey respond in Skopje?

Incidents and unplanned requests are handled under a 1-hour, around-the-clock incident response SLA. There is also a 15 minute premium response available where technicians are stationed on-site, as a paid add-on. On-site, dispatch and resolution times, priority tiers, and planned or scheduled work are agreed per site in the service agreement.

How is Reboot Monkey different from the facility operator's own staff?

Facility operators' own technicians work for the building. Reboot Monkey engineers work for the customer: they are independent from facility operators (not Equinix SmartHands, not NTT staff), follow the customer's instructions, and the same team can cover several buildings in the city under one agreement.

How do I get started with server migration in Skopje?

Send the site, the equipment and the task through the contact form. Reboot Monkey replies with a quote and an engineer plan for that facility. Once agreed, the customer adds the engineers to the facility's access list and the server migration work is scheduled under the operator's rules.

Plan your move in Skopje

Send the source, the destination and the equipment list, and Reboot Monkey will agree who does what for the physical move.

Published:

Get a quote