Skip to content

Hungary · Budapest

Data Center Migration in Budapest

Reboot Monkey moves servers, storage and network equipment between racks, rooms or facilities in Budapest. Engineers work in the customer's facility under the operator's site rules, and who disconnects, reconnects and tests the equipment is agreed per project.

Data Center Migration

  • 8

    services detailed for Budapest

  • 1

    agreement for every city

Plan your Budapest migration

Send your equipment list and target dates, and Reboot Monkey will quote the physical move.

In depth

Data Center Migration: 6 sections, open any to read more.

Data Center Migration in Budapest

Pro-M Victor Hugo stands on Victor Hugo u in Budapest. A move into, out of or within a Budapest data centre is a physical project first: equipment has to be taken out of live racks, transported, mounted again and cabled, and every step runs inside a building that someone else owns. In Reboot Monkey's service definitions, server migration means moving equipment between racks, rooms or facilities. That covers a move across the hall, a move to another suite in the same building, and a move between two sites. Reboot Monkey is a third-party datacenter services operator. It does not own or run the facilities involved, and it is not a hosting company, so the migration is planned around your equipment and the operators' access rules rather than around a platform of its own. Because the work happens in someone else's data centre, the first questions on a Budapest project are practical: which racks are being emptied, which racks receive the equipment, which carrier circuits and cross connects have to exist before cutover, and who on your side signs off each stage.

Datacenter Facilities in Budapest

Data centres in Budapest, ordered by the number of networks present:

  • Dataplex Budapest (T-Systems Magyarország Zrt.), Asztalos Sandor utca 13., 1087 Budapest: 67 networks; carriers Arelion, Core-Backbone, Global Network Management, Inter.link, Orange Wholesale International - EVPL and others
  • BIX Building (Victor Hugo street) (Budapesti Ingatlan Hasznosítási és Fejlesztési Nyrt.), Victor Hugo utca 18-22., 1132 Budapest: 61 networks; carriers Arelion, Inter.link, Nextremum and RETN
  • 2Connect DC10 (One Hungary Ltd._12301), Kozma utca 2., 1108 Budapest: 14 networks; carriers Arelion and RETN
  • VIVAnet DC (VIVAnet DataCenter Kft.), Venyige street 5., 1108 Budapest: 4 networks; carriers RETN
  • DoclerNet (Servergarden Kft.), Expo tér 5-7., 1101 Budapest: 1 network
  • Pro-M Victor Hugo (Pro-M (ex KIFÜ Hungarian Governmental Agency for ICT Development)), Victor Hugo u 18-22, H-1132 Budapest

Our Data Center Migration Services

A physical migration is built from several of Reboot Monkey's services, and a project uses the ones it needs. The scope is agreed with you before work starts.

  • Server migration: moving equipment between racks, rooms or facilities, including the decommissioning-side steps for the old location.
  • Rack and stack: installing, mounting and cabling new hardware at the destination, so the target racks are ready before equipment arrives.
  • Smart hands: technical work that needs diagnostic judgement and configuration knowledge, for example when equipment does not come back as expected after the move.
  • Remote hands: physical tasks carried out on your instruction, such as reboots, cable checks, component swaps and visual checks during cutover.
  • Connectivity: Reboot Monkey orders the cross connects and carrier circuits from the facility operator and the carriers present in the facility, and its engineers install and patch the cabling in your rack.
  • Data center decommissioning and IT asset disposition: removing and disposing of retired hardware once the move is complete, with data wiping, on-site shredding or degaussing, collection and transport, and resale or buyback quoted case by case.
  • Hardware monitoring: monitoring of your servers and network equipment by the Reboot Monkey NOC, which can run through the migration window.

Why Reboot Monkey

Migration roles are set per project. Reboot Monkey can run the whole physical move or work alongside your own team, and who disconnects, reconnects and tests the equipment is agreed in advance. That suits both a company with no hands on site in Budapest and a company with its own infrastructure staff who want extra capacity for the move window.

A second, briefed Reboot Monkey engineer is named as backup for every customer site, so a single absence does not stop a scheduled move.

Reboot Monkey sells the rack space, IP transit, leased IP addresses, network and hardware that a move depends on, together with the services that deliver, install and support them. A migration can therefore be quoted as one piece of work rather than split across separate suppliers for space, connectivity and hands.

As of 2026, Reboot Monkey's field engineers work in 190 countries and more than 400 locations. Prices are quoted on request and depend on the customer and the size of the job, so a quote starts from your equipment list, the source and destination locations, and the date you need the move completed.

How Reboot Monkey Works

These terms apply in every facility in Budapest where Reboot Monkey engineers work.

  • Response: 1-hour, around-the-clock incident response SLA, and a 15 minute premium response available where technicians are stationed on-site, as a paid add-on. The incident response SLA covers incidents and unplanned requests; on-site, dispatch and resolution times, priority tiers, and planned or scheduled work are agreed per site in the service agreement.
  • Monitoring: 24/7 NOC monitoring across all facilities, covering IPMI, iDRAC, SNMP, temperature, power, network signals.
  • Hardware: vendor-neutral technicians for Dell, HP, Cisco, Juniper and Arista equipment.
  • Independence: independent from facility operators (not Equinix SmartHands, not NTT staff).
  • One agreement: single provider across cities, so a customer in several cities needs only one agreement.
  • Service levels and terms: https://www.rebootmonkey.com/en/solutions/sla
  • Published case study: a major ICT provider engaged Reboot Monkey for three full infrastructure rollouts in Lahore, Karachi and Islamabad, with the hardware installed the same day at every site. Read the case study at https://www.rebootmonkey.com/en/resources/case-study/how-we-completed-3-full-deployments-across-pakistan

Data Center Migration

The data centres we work in hold their own certifications, such as ISO/IEC 27001 and ISO 9001. Ask us for the certificate of your site.

Frequently Asked Questions

What does data center migration cover in Budapest?

Data center migration in Budapest covers moving equipment between racks, rooms or facilities, installing and cabling the hardware at the destination, and the connectivity ordered from the facility operator and carriers. Retired hardware can be decommissioned and disposed of afterwards. The facility operator sets the site rules, and who disconnects, reconnects and tests the equipment is agreed per project.

Do you work in every datacenter in Budapest?

Reboot Monkey engineers work in any facility in Budapest where the customer has equipment and access, under the operator's own access and safety rules. The customer adds the engineers to the facility's access list before the first visit.

How fast can Reboot Monkey respond in Budapest?

Incidents and unplanned requests are handled under a 1-hour, around-the-clock incident response SLA. There is also a 15 minute premium response available where technicians are stationed on-site, as a paid add-on. On-site, dispatch and resolution times, priority tiers, and planned or scheduled work are agreed per site in the service agreement.

How is Reboot Monkey different from the facility operator's own staff?

Facility operators' own technicians work for the building. Reboot Monkey engineers work for the customer: they are independent from facility operators (not Equinix SmartHands, not NTT staff), follow the customer's instructions, and the same team can cover several buildings in the city under one agreement.

How do I get started with data center migration in Budapest?

Send the site, the equipment and the task through the contact form. Reboot Monkey replies with a quote and an engineer plan for that facility. Once agreed, the customer adds the engineers to the facility's access list and the data center migration work is scheduled under the operator's rules.

Plan your Budapest migration

Send your equipment list and target dates, and Reboot Monkey will quote the physical move.

Published:

Get a quote