Skip to content

Data Center Migration

Data Center Migration in Pakistan

Data center migration in Pakistan is the physical move of a customer's equipment between racks, rooms or facilities, carried out by Reboot Monkey engineers inside data centres that other companies own and run. Reboot Monkey can run the whole move or work alongside the customer's own team.

  • 7

    of our services in Pakistan

Choose your city

Services in Data Center Migration

In depth

Data Center Migration: 8 sections, open any to read more.

Data Center Migration in Pakistan: How It Works

A data center migration moves a customer's equipment from one location to another: between racks, between rooms or between facilities. Reboot Monkey is a third-party datacenter services operator. It sells rack space, IP transit, leased IP addresses, network, data-centre hardware and the services that deliver, install and support them, inside data centres that other companies own and run. It is not a hosting company and does not own datacenters, so a migration in Pakistan is a physical and network project carried out inside facilities that already have an operator.

A move can stay within one data center, from one rack or room to another, or leave it for another facility.

The facility operator owns and runs the building, including its power, cooling and access policy, and Reboot Monkey engineers work under the operator's site rules. A move between facilities touches two buildings, the origin and the destination, so the request should name both ends before any work is planned.

The split of work is set at the start. Reboot Monkey can run the whole physical move or work alongside the customer's own team; who disconnects, reconnects and tests the equipment is agreed per project. A customer with a capable in-house team can keep the testing in its own hands, and a customer without spare staff can hand the whole sequence to Reboot Monkey engineers, who are dispatched to the customer's facility.

When the move is an exit from a facility, datacenter exit and relocation applies: the physical move of the customer's equipment to its new location together with the removal and disposal of the hardware that is retired. Retired hardware does not travel to the destination, so it is identified in the request.

A request for a move in Pakistan starts from these points:

  • The equipment to be moved, where it stands today and where it is going.
  • The customer's asset list, which is the reference for the job.
  • Any retired hardware that will not move, so that its removal and disposal can be included.
  • Whether the customer's own team will take part, and which steps it will keep.
  • The destination racks, so that the cabling and the network connections can be planned for them.

Datacenter Landscape in Pakistan

Data centres in Pakistan, ordered by the number of networks present:

  • PTCL Misri Shah DC (Pakistan Telecommunication LTD (PTCL)), Khayaban-e-Muhafiz, D.H.A Phase 6, Karachi, Sindh 75500: 6 networks
  • PTCL Pak Capital (Pakistan Telecommunication LTD (PTCL)), Data Centre , Pak Capital Exchange , old Sabzi mandi , University Road, 74000 Karachi: 4 networks
  • KK Networks Private Limited, A1-506, Jeff Heights Gulberg III, 54660 Lahore: 3 networks
  • PKIX Lahore, PITB Arfa Karim Technology Park, 54000 Lahore: 3 networks
  • Transworld CLS (Trans World Associates (Pvt.) Ltd.), C10-19 Goth Mubarik Rd, Sector 54 Hawkes Bay Town, Goth Lashkari, 75500 Karachi: 3 networks
  • Multinet Pakistan Karachi (Multinet Pakistan Pvt. Ltd.), 1D-203, Sector 30, Korangi Industrial Area, D-17, Sector 30, Korangi Industrial Area, 74900 Karachi: 2 networks
  • PKIX Islamabad, HEC, Sector H-9, East Service Road, 44000 Islamabad: 2 networks
  • Transworld Associates Datacenter, Plot No. 24, Retalia Building G-6 Markaz, 04404 Islamabad: 2 networks
  • Nexlinx Lahore (Nexlinx Networks Pvt Ltd), 37-C1-C Gulberg III, Pakistan, 54660 Lahore: 1 network
  • CubeXS Weatherly (CubeXS Weatherly (Pvt) Ltd), Federation House, Clifton, 74500 Karachi

Data Center Migration by City

City pages for data center migration in Pakistan:

  • Karachi: https://www.rebootmonkey.com/en/pakistan/karachi/data-center-migration/

Data Center Migration in Pakistan: What We Deliver

A migration is made of physical and network tasks, and each task is a defined Reboot Monkey service. The customer can order the whole move or only the parts its own team does not cover, and the scope is set per project. Reboot Monkey engineers carry out the physical part of each in the customer's facility.

These services are combined per project. A move between two racks in one room needs a different set of services from an exit from one facility to another, and the services outside the move itself, such as remote hands or monitoring, can be added once the equipment is in its new racks.

  • Server migration: moving equipment between racks, rooms or facilities. This is the core of a migration, and the physical move is carried out by Reboot Monkey engineers.
  • Asset inventory: recording the customer's equipment in the data center by serial number, asset tag and rack position, against the customer's asset list. It can be run at the origin before the move and at the destination after it, so the same list covers both ends.
  • Rack and network design: the rack layout and the network topology of a new or expanding deployment, ending with documentation of the design and a controlled handover. It applies when the destination is a new or expanding deployment.
  • Rack and stack: installing, mounting and cabling new hardware. It is used where the destination receives new equipment together with the moved systems.
  • Structured cabling: installing, labelling and patching the cabling between the customer's racks and network equipment. It applies to moved and to new equipment alike.
  • Remote hands and smart hands: remote hands are physical tasks carried out on the customer's instruction, such as reboots, cable checks, component swaps and visual checks. Smart hands is technical work that needs diagnostic judgement and configuration knowledge. Both are available around the move for tasks the customer wants handled on instruction.
  • Data center decommissioning: removing and disposing of retired hardware. IT asset disposition (ITAD) adds data wiping, on-site shredding or degaussing, collection and transport, and resale or buyback quoted case by case, all processed by Reboot Monkey staff in a partner's processing facility or on the customer's site.

Why Reboot Monkey for Data Center Migration in Pakistan

A migration has a physical part and a network part, and Reboot Monkey handles both. Because Reboot Monkey is a third-party operator and not a hosting company, the customer decides which data center the equipment goes to, and the services follow it there.

Reboot Monkey sells the network for the rack: it orders the cross connects and carrier circuits from the facility operator and the carriers present in the facility, and Reboot Monkey engineers install and patch the cabling in the customer's rack. The customer therefore deals with one provider for the move and for the connections the moved equipment needs.

IP transit is offered as Economy, Premium and DDoS Premium plans, each quoted per data center for the capacity the customer needs. IPv4 leasing means leasing IPv4 addresses, alone or together with IP transit and rack space under one agreement, so the addresses, the transit and the rack space for the new location can be arranged together.

Once the equipment is running in the new racks, hardware monitoring is available: monitoring of the customer's servers and network equipment by the Reboot Monkey NOC.

For a customer that does not want to buy the hardware for the new location, IT infrastructure turnkey and run applies. You or your investors fund the IT infrastructure. Reboot Monkey buys, installs, configures and then runs it for you, inside the data center you choose. The data center itself stays with its operator.

In practice a migration involves a short list of parties: the customer, Reboot Monkey, the facility operator at each end and the carriers whose circuits are ordered. Reboot Monkey carries out the physical work and places the orders for cross connects and carrier circuits. For a procurement manager comparing providers, the useful question is which of these tasks come from one party, and here the physical move, the cabling in the rack, the orders for connections and the leasing of IPv4 addresses all come from Reboot Monkey.

Prices are quoted on request and depend on the customer and the size of the job.

How Reboot Monkey Works

These terms apply in every facility in Pakistan where Reboot Monkey engineers work.

  • Response: 1-hour, around-the-clock incident response SLA, and a 15 minute premium response available where technicians are stationed on-site, as a paid add-on. The incident response SLA covers incidents and unplanned requests; on-site, dispatch and resolution times, priority tiers, and planned or scheduled work are agreed per site in the service agreement.
  • Monitoring: 24/7 NOC monitoring across all facilities, covering IPMI, iDRAC, SNMP, temperature, power, network signals.
  • Hardware: vendor-neutral technicians for Dell, HP, Cisco, Juniper and Arista equipment.
  • Independence: independent from facility operators (not Equinix SmartHands, not NTT staff).
  • One agreement: single provider across cities, so a customer in several cities needs only one agreement.
  • Service levels and terms: https://www.rebootmonkey.com/en/solutions/sla
  • Published case study: a major ICT provider engaged Reboot Monkey for three full infrastructure rollouts in Lahore, Karachi and Islamabad, with the hardware installed the same day at every site. Read the case study at https://www.rebootmonkey.com/en/resources/case-study/how-we-completed-3-full-deployments-across-pakistan

Data Center Migration

The data centres we work in hold their own certifications, such as ISO/IEC 27001 and ISO 9001. Ask us for the certificate of your site.

Data Center Migration in Other Countries

A migration can involve more than one country, for example when equipment leaves Pakistan for a facility abroad or when one programme covers several sites. Whether the destination is a single rack in one building or a set of sites in different countries, the request is made the same way: the customer describes the equipment, the origin and the destination. As of 2026, Reboot Monkey's field engineers work in 190 countries and more than 400 locations.

For programmes that span sites, multi-site rollouts apply: one installation programme carried out at several of the customer's sites by Reboot Monkey engineers. A second, briefed Reboot Monkey engineer is named as backup for every customer site, so each site in the programme has a named alternate for the engineer assigned to it.

The sequence at each site follows the same request flow as a single move: the equipment is recorded against the customer's asset list, moved by Reboot Monkey engineers or by the customer's own team as agreed, cabled and patched in the customer's rack, and connected through the cross connects and carrier circuits ordered for it. What changes from site to site is the location of the racks and the equipment that goes into them.

Links between the old and the new location are a separate item from the move itself. Dark fibre and wavelengths cover them: dark fibre between data centres and wavelength circuits, ordered from the carriers and quoted on request.

Once the migration is complete, a customer with recurring physical tasks at its sites can place them on remote hands retainers and hour blocks: remote hands agreed as a retainer or as a block of hours for recurring work, with terms agreed per customer and quoted on request. Spares for those tasks can be held at the site, because hardware supply includes spare parts, with spares kept in the customer's rack on request.

A customer whose equipment is moving to or from Norway can start from Data Center Migration in Norway.

Frequently Asked Questions

What does data center migration cover in Pakistan?

Data center migration in Pakistan covers the physical move of the customer's equipment between racks, rooms or facilities. When the move is an exit, it also includes removing and disposing of the hardware that is retired. Reboot Monkey can run the whole move or work alongside the customer's own team, and who disconnects, reconnects and tests the equipment is agreed per project.

Do you work in every datacenter in Pakistan?

Reboot Monkey engineers work in any facility in Pakistan where the customer has equipment and access, under the operator's own access and safety rules. The customer adds the engineers to the facility's access list before the first visit.

How fast can Reboot Monkey respond in Pakistan?

Incidents and unplanned requests are handled under a 1-hour, around-the-clock incident response SLA. There is also a 15 minute premium response available where technicians are stationed on-site, as a paid add-on. On-site, dispatch and resolution times, priority tiers, and planned or scheduled work are agreed per site in the service agreement.

How is Reboot Monkey different from the facility operator's own staff?

Facility operators' own technicians work for the building. Reboot Monkey engineers work for the customer: they are independent from facility operators (not Equinix SmartHands, not NTT staff), follow the customer's instructions, and the same team can cover several buildings in the country under one agreement.

How do I get started with data center migration in Pakistan?

Send the site, the equipment and the task through the contact form. Reboot Monkey replies with a quote and an engineer plan for that facility. Once agreed, the customer adds the engineers to the facility's access list and the data center migration work is scheduled under the operator's rules.

Plan a Data Center Migration in Pakistan

Describe the equipment to be moved, where it stands today and where it is going, and Reboot Monkey will respond with a quote for the job.

Published: