Malaysia · Cyberjaya
Data Center Decommissioning in Cyberjaya
Reboot Monkey removes and disposes of retired hardware from customer racks in Cyberjaya. Engineers record serial numbers, asset tags and rack positions against your asset list, log every item as it leaves the rack, and schedule the removal with you in advance, including any out-of-hours or weekend window the facility requires.
In Data Center Decommissioning
- Data Center Decommissioning
- Colocation
- Data Center Migration
- Rack and Stack
- Remote Hands
- Smart Hands
- Server Migrationon request
- ITADon request
Data Center Decommissioning
7
services detailed for Cyberjaya
1
agreement for every city
Plan your decommissioning in Cyberjaya
Send the asset list and the rack locations, and Reboot Monkey will quote the job.
In depth
Data Center Decommissioning: 6 sections, open any to read more.
Data Center Decommissioning in Cyberjaya
CSF CX1 / TelcoHub1 Kuala Lumpur stands on CSF Building in Cyberjaya. For a CTO, IT Director or procurement manager, the question when retiring equipment in a facility like this is who removes it, how the removal is recorded and what happens to the hardware afterwards. Reboot Monkey is a third-party datacenter services operator. It does not own or run the building. The facility operator owns and runs the building, including its power, cooling and access policy, and Reboot Monkey engineers work under the operator's site rules. Data center decommissioning is the removal and disposal of retired hardware. The work is planned around the customer's asset list rather than around the engineer's convenience, so the people who sign off the project can compare what was removed with what was expected. Removal is scheduled with the customer in advance. Where the facility requires work outside normal hours, including weekend windows, the schedule is agreed beforehand so that access and any escort arrangements are settled before the engineer arrives on site.
Datacenter Facilities in Cyberjaya
Data centres in Cyberjaya, ordered by the number of networks present:
- CSF CX1 / TelcoHub1 Kuala Lumpur (CSF Group), CSF Building, Computer Exchange 1, Jalan Teknokrat 6, Cyberjaya 63000: 34 networks; carriers SG.GS
- CX2 / MY01 Cyberjaya Malaysia (Bridge Data Centres), MY02, 7118 Jalan Impact, Cyberjaya 63000: 27 networks; carriers SG.GS
- CJ1 CYBERJAYA (Mytelehaus), No.1, Jalan Cyber Point 4, Cyber 8, Cyberjaya 63000: 24 networks; carriers SG.GS
- NTT Cyberjaya Data Center (CBJ) (NTT DATA's Global Data Centers division), 43000 Jalan APEC, Cyberjaya, Selangor Darul Ehsan, 63000: 15 networks; carriers SG.GS
- TM ONE KVDC, Cyberjaya (Telekom Malaysia Berhad (TM)), Lingkaran Teknokrat Timur, Cyberjaya 63000: 13 networks; carriers SG.GS
- AIMS Cyberjaya (AIMS Data Centre Sdn Bhd), Jalan Teknokrat 1/2, Cyber 3, Cyberjaya 63000: 10 networks; carriers SG.GS
- AIMS CJ1 Cyberjaya (AIMS Data Centre Sdn Bhd), Jalan Cyber Point 4, Cyber 8, Cyberjaya 63000: 7 networks; carriers SG.GS
- PLTPRO Data Centre (PLTPRO Data Centre Sdn Bhd), 3rd Floor, West Wing, CSF Computer Exchange 2, Cyberjaya 63000: 5 networks
- Equinix KL1 - Kuala Lumpur (Equinix, Inc.), No. 2, Jalan Cyber Point 4, Cyber 8, Cyberjaya 63000: 4 networks; carriers SG.GS
- IP ServerOne MYIX-CJ1 (IP ServerOne Solutions Sdn Bhd), Jalan Cyber Point 4, Cyber 8, Cyberjaya 63000: 2 networks
Our Data Center Decommissioning Services
The scope of a decommissioning job in Cyberjaya is set out below. Each step is recorded so that the customer's asset register and the physical state of the rack agree when the job closes.
- Recording: serial numbers, asset tags and rack positions are recorded against the customer's asset list.
- Scheduling: removal is agreed with the customer in advance, including any out-of-hours or weekend windows the facility requires.
- Scope: decommissioning covers servers, switches, storage arrays, and their cabling and rail kits.
- Logging: every item is logged as it is removed, which gives the customer a running record of the job.
- Disposal: retired hardware is removed and disposed of. Where the equipment holds data, IT asset disposition (ITAD) covers data wiping, on-site shredding or degaussing, collection and transport, and resale or buyback quoted case by case. This work is processed by Reboot Monkey staff in a partner's processing facility or on the customer's site.
- Related work: if equipment is not being retired but moved, server migration covers moving equipment between racks, rooms or facilities, and rack and stack covers installing, mounting and cabling new hardware.
Why Reboot Monkey
Reboot Monkey sells rack space, IP transit, leased IP addresses, network, data-centre hardware and the services that deliver, install and support them, inside data centres that other companies own and run. It is not a hosting company and it is not a datacenter owner, which keeps the decommissioning work independent of any one landlord. Because the same engineers also install and patch cabling in customer racks, they arrive at a decommissioning job already familiar with how racks are cabled and labelled. For connectivity, Reboot Monkey orders the cross connects and carrier circuits from the facility operator and the carriers present in the facility, so network circuits can be ended as part of the same project when a rack is cleared. As of 2026, Reboot Monkey's field engineers work in 190 countries and more than 400 locations. A second, briefed Reboot Monkey engineer is named as backup for every customer site, so a decommissioning schedule does not depend on a single person being available. Prices are quoted on request and depend on the customer and the size of the job. To start, send the asset list, the rack locations and the date range you have in mind, and the removal can be planned from there.
How Reboot Monkey Works
These terms apply in every facility in Cyberjaya where Reboot Monkey engineers work.
- Response: 1-hour, around-the-clock incident response SLA, and a 15 minute premium response available where technicians are stationed on-site, as a paid add-on. The incident response SLA covers incidents and unplanned requests; on-site, dispatch and resolution times, priority tiers, and planned or scheduled work are agreed per site in the service agreement.
- Monitoring: 24/7 NOC monitoring across all facilities, covering IPMI, iDRAC, SNMP, temperature, power, network signals.
- Hardware: vendor-neutral technicians for Dell, HP, Cisco, Juniper and Arista equipment.
- Independence: independent from facility operators (not Equinix SmartHands, not NTT staff).
- One agreement: single provider across cities, so a customer in several cities needs only one agreement.
- Service levels and terms: https://www.rebootmonkey.com/en/solutions/sla
- Published case study: a major ICT provider engaged Reboot Monkey for three full infrastructure rollouts in Lahore, Karachi and Islamabad, with the hardware installed the same day at every site. Read the case study at https://www.rebootmonkey.com/en/resources/case-study/how-we-completed-3-full-deployments-across-pakistan
Data sanitization and certificates
The data centres we work in hold their own certifications, such as ISO/IEC 27001 and ISO 9001. Ask us for the certificate of your site.
- NIST SP 800-88 data sanitization
- Certificate of Destruction issued per storage device processed
Frequently Asked Questions
What does data center decommissioning cover in Cyberjaya?
In Cyberjaya, decommissioning covers servers, switches, storage arrays, and their cabling and rail kits. Serial numbers, asset tags and rack positions are recorded against the customer's asset list, every item is logged as it is removed, and removal is scheduled in advance, including any out-of-hours or weekend windows the facility requires.
Do you work in every datacenter in Cyberjaya?
Reboot Monkey engineers work in any facility in Cyberjaya where the customer has equipment and access, under the operator's own access and safety rules. The customer adds the engineers to the facility's access list before the first visit.
How fast can Reboot Monkey respond in Cyberjaya?
Incidents and unplanned requests are handled under a 1-hour, around-the-clock incident response SLA. There is also a 15 minute premium response available where technicians are stationed on-site, as a paid add-on. On-site, dispatch and resolution times, priority tiers, and planned or scheduled work are agreed per site in the service agreement.
How is Reboot Monkey different from the facility operator's own staff?
Facility operators' own technicians work for the building. Reboot Monkey engineers work for the customer: they are independent from facility operators (not Equinix SmartHands, not NTT staff), follow the customer's instructions, and the same team can cover several buildings in the city under one agreement.
How do I get started with data center decommissioning in Cyberjaya?
Send the site, the equipment and the task through the contact form. Reboot Monkey replies with a quote and an engineer plan for that facility. Once agreed, the customer adds the engineers to the facility's access list and the data center decommissioning work is scheduled under the operator's rules.
Data Center Decommissioning nearby
Other services in Cyberjaya
Plan your decommissioning in Cyberjaya
Send the asset list and the rack locations, and Reboot Monkey will quote the job.