Map: Natural Earth
Data Center Migration
Data Center Migration in Indonesia
Data center migration in Indonesia is the physical move of servers and network equipment between racks, rooms or facilities. Reboot Monkey engineers are dispatched to the customer's data center, and the split of work between them and the customer's own team is agreed per project.
8
of our services in Indonesia
Choose your city

Photo: Nanami976 · CC BY-SA 4.0 · cropped · source
Jakarta
- Data Center Migration
- Data Center Decommissioning
- Rack and Stack
- Remote Hands
- Server Migration
- Smart Hands
Services in Data Center Migration
- Data Center Migration
- Colocation
- Data Center Decommissioning
- ITAD
- Rack and Stack
- Server Migration
- Smart Hands
- Remote Handson request
In depth
Data Center Migration: 8 sections, open any to read more.
Data Center Migration in Indonesia: How It Works
A data center migration in Indonesia is, in operational terms, a server migration: moving equipment between racks, rooms or facilities. Reboot Monkey carries out the physical side of that move, from the first scoping conversation to the final test.
A request starts with a statement of what moves and where. The source location, the destination, the list of equipment and the date by which the move must be finished are the inputs Reboot Monkey needs to scope the job. Where the destination is a different facility, the destination rack and its network are named at this stage as well. From those inputs the project is divided into physical stages: disconnecting equipment at the source, moving it, mounting and cabling it at the destination, reconnecting it and testing it. Each stage is assigned to a named party before the work is scheduled, so the customer's project plan and the physical work line up.
Responsibility for those stages is not fixed in advance. Reboot Monkey can run the whole physical move or work alongside the customer's own team; who disconnects, reconnects and tests the equipment is agreed per project. A customer with a capable in-house team can keep the stages it prefers and hand the remainder to Reboot Monkey, and a customer without one can hand over the whole move.
Reboot Monkey engineers are dispatched to the data center where the equipment sits. The facility operator owns and runs the building, including its power, cooling and access policy, and Reboot Monkey engineers work under the operator's site rules.
Testing is the last of the physical stages, and what it covers is part of the same agreement as who disconnects and who reconnects.
Work that is not a move is separated at scoping. The equipment list is sorted into groups: equipment that moves, equipment that is retired and new hardware that arrives. A list that names each item and its group gives the engineers a clear picture of the job before they are dispatched.
Datacenter Landscape in Indonesia
Data centres in Indonesia, ordered by the number of networks present:
- Datacenter APJII-Cyber (Asosiasi Penyelenggara Jasa Internet Indonesia), Cyber Building, Jalan Kuningan Barat No. 8, 12710 Jakarta Selatan: 752 networks; carriers DETELNETWORKS, GERBANGAKSES and SG.GS
- IDC 3D (PT. Internetindo Data Centra Indonesia), Jl. Duren Tiga Raya No.7H, Duren Tiga, Pancoran, 12760 Jakarta Selatan: 535 networks; carriers DETELNETWORKS, Matrix NAP Info and SG.GS
- NTT Jakarta 2 Data Center (JKT2) (NTT DATA's Global Data Centers division), Jalan Kuningan Barat No.8 NTT building, Kuningan Barat, Mampang Prapatan, Kota Jakarta (inside Cyber Area), 12710: 250 networks; carriers DETELNETWORKS, GERBANGAKSES, Matrix NAP Info and SG.GS
- OMADATA - E1 - SUB (PT Omadata Padma Indonesia), Gedung Intiland, Jl. Panglima Sudirman No.101-103, Embong Kaliasin, Genteng, 60271 Surabaya: 228 networks; carriers Datakom Padma Jaya and Matrix NAP Info
- ProDC (PT SOLUSI DATA CEPAT), Jl. Kuningan Barat Raya No.9B, RT03 RW02, Kelurahan Kuningan Barat, Kecamatan Mampang Prapatan, 12710 Jakarta Selatan: 121 networks; carriers SG.GS
- Cyber Data Center International Jakarta, Cyber Building, 1st & 2nd floor. Jl. Kuningan Barat no. 8, 12710 Jakarta Selatan: 119 networks; carriers Matrix NAP Info
- neuCentrIX - Karet Tengsin (PT Telekomunikasi Indonesia Int), Jl. K.H. Mas Mansyur No.1, RT.13/RW.8, Karet Tengsin, Kecamatan Tanah Abang, 10250 Jakarta Pusat: 118 networks; carriers Matrix NAP Info
- EDGE1 (EG1) - Digital Edge JKT1 - Jakarta (Digital Edge Indonesia), Jl. Kuningan Barat Raya, Kuningan Bar., Kec. Mampang Prpt., 12950 Jakarta Selatan: 93 networks; carriers DETELNETWORKS and Matrix NAP Info
- NEX Datacenter (NEX-JK2) Jakarta (PT. CBN Nusantara (NEX Datacenter)), M-Ten Bldg, Jalan Kapten Tendean 20C, 12710 Jakarta Selatan: 91 networks; carriers DETELNETWORKS and Matrix NAP Info
- Datacenter APJII-Cyber JAKARTA (PT Dexano Ryu Fusena), Jakarta Selatan, Daerah Khusus Ibukota Jakarta, 12710: 74 networks
Data Center Migration by City
City pages for data center migration in Indonesia:
- Jakarta: https://www.rebootmonkey.com/en/indonesia/jakarta/data-center-migration/
Data Center Migration in Indonesia: What We Deliver
A migration project in Indonesia is assembled from the services below, and its scope is the set of them the customer selects. Reboot Monkey engineers deliver each one in the data center where the equipment sits.
- Server migration: moving equipment between racks, rooms or facilities. It is the core of a migration project and covers the physical move from the source to the destination.
- Rack and stack: installing, mounting and cabling new hardware. In a migration it applies to hardware that joins the destination rack alongside the equipment that moved.
- Network connectivity: Reboot Monkey sells the network for the rack. It orders the cross connects and carrier circuits from the facility operator and the carriers present in the facility, and Reboot Monkey engineers install and patch the cabling in the customer's rack.
- Remote hands: physical tasks carried out on the customer's instruction (reboots, cable checks, component swaps, visual checks). Once equipment is in its new location, this is how such tasks are requested.
- Smart hands: technical work that needs diagnostic judgement and configuration knowledge. It is the service to ask for when a task at the destination needs more than a physical action.
- Data center decommissioning: removing and disposing of retired hardware. In a migration it applies to equipment that is not moved.
- IT asset disposition (ITAD): data wiping, on-site shredding or degaussing, collection and transport, and resale or buyback quoted case by case, all processed by Reboot Monkey staff in a partner's processing facility or on the customer's site. It follows decommissioning when retired hardware has to leave the customer's control.
- Hardware monitoring: monitoring of the customer's servers and network equipment by the Reboot Monkey NOC.
Why Reboot Monkey for Data Center Migration in Indonesia
Reboot Monkey is a third-party datacenter services operator. It sells rack space, IP transit, leased IP addresses, network, data-centre hardware and the services that deliver, install and support them. It is not a hosting company and it does not own datacenters, so a migration with Reboot Monkey is a services engagement and not a hosting arrangement.
In a migration those pieces line up with the stages of the project. Delivery and installation correspond to the physical move and to rack and stack work at the destination, and support corresponds to remote hands, smart hands and hardware monitoring once the equipment is running in its new location. Rack space, IP transit, leased IP addresses and network are the items a destination rack needs, and the same company that moves the equipment sells them. Hardware the customer wants to buy for the destination belongs in the same conversation, because Reboot Monkey sells data-centre hardware.
Reboot Monkey does not host the customer's applications or data. Its part in a migration is the physical work, together with the network and hardware it sells, and Reboot Monkey engineers carry out that work in the customer's data center.
A second, briefed Reboot Monkey engineer is named as backup for every customer site. For a migration, that means each site the project touches has a named second engineer as well as the engineer who carries out the work.
A proposal reads differently depending on who reviews it. For a CTO, the technical scope is a list of services with stated boundaries: server migration for the move, rack and stack for new hardware, smart hands where diagnostic judgement is needed, and hardware monitoring by the Reboot Monkey NOC. For an IT director, the working question is who touches the equipment at each stage, and the answer is written into the project before work is scheduled. For a procurement manager, the inputs that set the quote are the equipment list, the destination and the services selected. Prices are quoted on request and depend on the customer and the size of the job.
How Reboot Monkey Works
These terms apply in every facility in Indonesia where Reboot Monkey engineers work.
- Response: 1-hour, around-the-clock incident response SLA, and a 15 minute premium response available where technicians are stationed on-site, as a paid add-on. The incident response SLA covers incidents and unplanned requests; on-site, dispatch and resolution times, priority tiers, and planned or scheduled work are agreed per site in the service agreement.
- Monitoring: 24/7 NOC monitoring across all facilities, covering IPMI, iDRAC, SNMP, temperature, power, network signals.
- Hardware: vendor-neutral technicians for Dell, HP, Cisco, Juniper and Arista equipment.
- Independence: independent from facility operators (not Equinix SmartHands, not NTT staff).
- One agreement: single provider across cities, so a customer in several cities needs only one agreement.
- Service levels and terms: https://www.rebootmonkey.com/en/solutions/sla
- Published case study: a major ICT provider engaged Reboot Monkey for three full infrastructure rollouts in Lahore, Karachi and Islamabad, with the hardware installed the same day at every site. Read the case study at https://www.rebootmonkey.com/en/resources/case-study/how-we-completed-3-full-deployments-across-pakistan
Data Center Migration
The data centres we work in hold their own certifications, such as ISO/IEC 27001 and ISO 9001. Ask us for the certificate of your site.
Data Center Migration in Other Countries
As of 2026, Reboot Monkey's field engineers work in 190 countries and more than 400 locations. That is a statement about the company's field engineering as a whole, and a migration in Indonesia is scoped on its own equipment, destination and services. A migration has a source and a destination, and they do not have to share a country: a move can start in Indonesia and end elsewhere, or arrive in Indonesia from another country.
A cross-border request follows the same order as any other. The customer states what moves, where it comes from and where it goes. Reboot Monkey scopes the job from the equipment list, both locations and the date, agrees the split of roles for each stage, and dispatches engineers to the data center at each end. The physical stages then run in order: disconnect and move at the source, then mount, cable, reconnect and test at the destination.
The agreed split of work applies stage by stage. A customer can keep disconnection at the source with its own team and ask Reboot Monkey to carry out mounting, cabling and testing at the destination, or the reverse, because who disconnects, reconnects and tests is agreed per project.
Equipment that is not travelling is dealt with at the source end. Retired hardware is removed and disposed of through decommissioning, and ITAD covers data wiping, on-site shredding or degaussing, collection and transport, with resale or buyback quoted case by case.
For a destination in Ireland, see Data Center Migration in Ireland. For a move to or from Hong Kong, see Data Center Migration in Hong Kong. For equipment going to or from India, see Data Center Migration in India.
Frequently Asked Questions
What does data center migration cover in Indonesia?
In Indonesia, data center migration covers server migration: moving equipment between racks, rooms or facilities. Reboot Monkey can run the whole physical move or work alongside the customer's own team, and who disconnects, reconnects and tests the equipment is agreed per project. Related work, such as rack and stack for new hardware or decommissioning of retired hardware, can be added to the same scope.
Do you work in every datacenter in Indonesia?
Reboot Monkey engineers work in any facility in Indonesia where the customer has equipment and access, under the operator's own access and safety rules. The customer adds the engineers to the facility's access list before the first visit.
How fast can Reboot Monkey respond in Indonesia?
Incidents and unplanned requests are handled under a 1-hour, around-the-clock incident response SLA. There is also a 15 minute premium response available where technicians are stationed on-site, as a paid add-on. On-site, dispatch and resolution times, priority tiers, and planned or scheduled work are agreed per site in the service agreement.
How is Reboot Monkey different from the facility operator's own staff?
Facility operators' own technicians work for the building. Reboot Monkey engineers work for the customer: they are independent from facility operators (not Equinix SmartHands, not NTT staff), follow the customer's instructions, and the same team can cover several buildings in the country under one agreement.
How do I get started with data center migration in Indonesia?
Send the site, the equipment and the task through the contact form. Reboot Monkey replies with a quote and an engineer plan for that facility. Once agreed, the customer adds the engineers to the facility's access list and the data center migration work is scheduled under the operator's rules.
Cities we cover in Indonesia
Plan Your Data Center Migration in Indonesia
Send the equipment list, the source, the destination and the date. Prices are quoted on request and depend on the customer and the size of the job.